Site Management, Construction Site Management, Project Planning, Site Manager, Construction Industry, Financial Management, Real Estate Accounting
This thesis explores the role of a site manager in the construction industry, highlighting the skills and challenges involved in managing a construction site. From the preliminary study to the execution phase, the site manager plays a crucial role in ensuring the project's success. With a focus on financial and real estate accounting, this study provides valuable insights into the world of construction management.
[...] The weekly presence of the construction manager on the site guarantees a very high reactivity to resolve all the disputes encountered, such as the reading of sometimes complex plans, an inappropriate choice of material, or to interact with other companies present on the site. My attention is also focused on the quality of the work carried out by my employees, but also by subcontractors. The goal is to verify compliance with the specifications. Moreover, careful work upstream also saves time on the overall process. Indeed, this task will require less finishing and there will be no often very time-consuming rework to be done afterwards. [...]
[...] In addition, the works should not hinder the good functioning of the signs and the clientele. The total cost should not exceed 600,000 CHF for a duration of 7 months. During the entire construction site, the pedestrian circulation axes had to be marked to ensure their safety. The width of the circulation areas had to be 1.8 m and reduced to 1.2 m in case of difficulty. Furthermore, the ramps and the disabled accesses, as well as the fire access roads had to be preserved. [...]
[...] Costs Allocated to the Different Phases The cost of the painting work was 12 to 20 CHF per m². The cost of the bathroom transformation was 12,000 to 20,000 CHF. The costs of tiling were 30,000 CHF and of plastering 68,000 CHF. 3.2.8. Global Site Management At the end of the month, a global balance was made to take stock of the financial situation of the site and ensure compliance with costs. [...]
[...] Human and Material Resources A team of 7 people was necessary for the completion of the work, consisting of a team leader and 6 specialized workers. The construction materials were purchased from the companies Gétaz Romang, Knauf, Marmoran Saint-Gobain Weber SA, Jallut Peinture SA, Masson & Cia SA. As with the previous project, I was in charge of selecting the materials after consultation with the client in accordance with the specifications established. Technical sheets are placed in annexes to 6). [...]
[...] In the event of accidental spills or leaks of products during the project, the construction manager will be responsible. They will notify the authorities without prior notice and alert the rescue center, as well as the environmental protection services. The construction manager will pay attention to the implementation of a circulation system within the construction site. Dimensioned circulation routes will be set up. The dimensioning will depend on the type of traffic and the climatic conditions (frost, strong temperatures, etc.) during the construction site. Temporary paths will then be built with access zones to machines and pedestrian zones. [...]